top of page

Испытание пластов на трубах в процессе бурения

 Formation test is a technological combination of operations in a well, associated with a round trip, creating a deep depression on the reservoir, multi-cycle generation of the influx of reservoir fluid and sample collection with the registration of the diagrams of P and T at the bottom and in the pipes via autonomous manometers.

Objectives Solved:

  • Assessment of filtration properties and nature of saturation of layers with ambiguous characteristics;

  • Exclusion of missing a productive formation

  • Assessment of the character of reservoir saturation at the field with a known position of the OWC and GLC, and assessment of hydrodynamic parameters of these reservoirs required for the  development projects

bottom of page