top of page

Formation Perforation

Formation perforation on the cable

​

Advantages: 

  • Ability to connect several sections together during perforation, which allows to increase the efficiency and quality of the performed operations

  • Good penetrative ability with minimal impact on cement 

  • Use of only high quality and certified charges of both Russian and overseas manufacturers

  • Elimination of well blockage possibility

  • Ability to combine charges

  • Wide range of available perfo-systems of variable sizes from 48 to 114 mm

​

​

Formation perforation on tubing with packer on pressure draw-down.

​

Empty tubing is descended into the well closed with a shut-off valve. Pressure drawdown is generated by topping calculated amount of fluid. Perforation is initiated by dropping either an initiation rod or pushing a ball.

​

Advantages: 

  • Reduced amount of time on well completion

  • Effective formation perforation and well completion

  • Creation of any pressure drawdowns on the formation, without increased pressure on the production string.

  • Supervision of conducted operations in the well

  • Hydrodynamic surveys

Auxiliary Equipment

"PRICEL" Tool 

​

Advantages:

  • Control of perforating gun movement in the well 

  • Reference of perforating gun to a given perforation interval based on its position relative to casing collar joints

  • Registration of factual perforated interval and control of an electric circuit

​

Stuffing box​

 

Cleans the geophysical cable from oil and water by compression, preventing pollution of machinery and territory. working pressure 35 Mpa.

​

Lubricator

​

Chamber for downhole equipment, length and dimensions depend on the type of equipment used.

​

Blowout preventer


Allows to close the well with descended geophysical equipment in emergency situations

​

​

bottom of page